Baldwin Road and Bridge 2007 03 12

BALDWIN COUNTY ROAD & BRIDGE MEETING
MONDAY, MARCH 12, 2007
REGULAR MEETING
8:40 A.M.
BALDWIN CENTRAL ANNEX ROBERTSDALE, ALABAMA

COMMISSION MEMBERS PRESENT:

COMMISSIONER WAYNE A. GRUENLOH
COMMISSIONER CHARLES GRUBER
COMMISSIONER DAVID BISHOP

BALDWIN COUNTY ROAD & BRIDGE DEPARTMENT MEMBERS PRESENT:

CAL MARKERT, COUNTY ENGINEER
GREG SMITH, PERMIT ENGINEER
FRANK LUNDY, CONSTRUCTION ENGINEER
VINCE BEEBE, DESIGN ENGINEER
WESLEY PENNINGTON, ROW MANAGER
LAWRENCE WILSON, PRE-CONSTRUCTION ENGINEER
LLOYD TURNER, CHIEF ACCOUNTANT
ED BELLUE, ENGINEERING TECH I1
JOHN BYRD, ENGINEERING TECH I
LISA SANGSTER, OFFICE ASSISTANT I11

 

MR. BEEBE: I'll move on to the next project, which is the 1-10 service road basically from U. S. 98 to Woodrow Lane. Basically this is still in the early coordination and funding level. We are
scheduled to meet with Timber Creek and Cypress Equities, you know, the developers of Bass Pro Shop Wednesday of this week to finalize some of these decisions that need to be made. And once we have
that, we can negotiate a fee and finalize the contract that we have with our consultant on that project as well. Can I answer any questions?

All right. Let me move on to the landscaping of Highway 287.

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.